How to install rake gable trim.
Trim a metal roof transition.
Contentdata html gambrel and transition trim notched upper gambrel flashing part general length gauge girth weight each lg 105 imp rib 3 29 12 1 84 lg 105a reg rib 3 29 12 1 84 lg 105b am dr 3 29 12 1 84 lg 105c rug rib 3.
Step by step instructions for installation of gable and rake trim on an exposed fastener panel.
12 residential rake trim.
Trim is an important element of roof assembly as each different section of metal roofing will require a trim specific to that area.
Fits a36 c4 5 4 steel c channel 1 584 in.
10 red roof edge.
Retro split storm collar all style medium retro split storm collar flashing.
The lower portion of the transition rests on top of the lower panel ribs and should be installed with outer closures to ensure water tightness.
Two slopes meeting on your metal roof need their own metal.
Sidewall and endwall trims are installed to provide a watertight transition between a wall and roof section.
It extends shingles or steel roofing out over the eaves and helps prevent water from backing up under the roofing material.
The peak of your metal roof needs a different trim from the gables.
The transition is installed under the upper slope panel and on top of the lower slope panel.
Add up the total amount of transition and divide by 9 5.
Butyl tape sealants closures for exposed fastener and zee flashing for hidden fastener are also available.
How to install metal roofing panels.
The edge of your metal roof needs a different trim than the peak of your metal roof.
The piece that allows us to join the two different slopes is the pitch transition trim.
Used when transitioning from a higher slope to a lower slope.
18 w x 10.
10 long length 26 gauge metal matches the color of the panels use with inside closures and outside closures how many do i need.
How to install pitch transition trim.
This allows water to flow off the upper panels out over the trim onto the lower panels and exits the roof at the eaves.