Roll modified bitumen roofing sheets over the entire roof.
Torch down rolled roofing installation.
Cut the bitumen sheets to length with a.
Torch down roofing sometimes referred to as torch on roofing is so named because it requires an open flame propane torch.
Installation of a three layer torch down roofing system requires knowledge and experience with using a blowtorch.
Bitumen roofing rolls can be large and heavy so get help.
Torch down step by step some trick and tips on how to lay down a torch down roofing.
Install the overlay.
Once you see bubbles forming gently roll the roofing forward with your foot to install.
Align the next sheet of modified bitumen roofing so it covers the edge of the first sheet by a few inches and repeat the process.
Installing the torch down roofing involves flames and melted asphalt.
Lay down a moisture barrier.
On top of the insulation your roofing contractor will lay down a vapor barrier.
Torch down roof application step 1.
In this installation method sheets of modified bitumen are rolled out onto the roof and a roofing professional uses a hand held propane torch to heat the material and adhere it to the surface.
Using this type of tool to install a torch down system calls for the right type of materials and insulation to ensure that the torch does not damage the overall structure.
Insulation is especially important in colder climates but it s an essential part of any.
Wear heavy duty gloves and work boots.
Run the tip of the flame along the crease between the roofing felt and the roofing roll.