Many homes have an asphalt shingle roof but some have wood metal tile and slate which can be more expensive.
Testingblend roof demo.
Time to lift the roof and start removing the leaning block wall.
The roof visualizer offers a full suite of customization tools allowing you to adjust any product s size angle rotation tilt and shading to create the most realistic simulation possible.
Free aerial satellite and drone roof measurement software for roofing contractors.
Show property owners a side by side comparison of numerous products and colors helping them choose the exact look they want prior to installation.
I have a milwaukee worm drive saw that is a bit heavy for everyday use.
Nailed to the trusses or rafters.
Tear off roof remove existing roofing material roof paper vent jacks and flashing and gutters if needed.
Existing buildings requirements are sprinkled throughout the i codes.
Asphalt shingle roof debris disposal costs to load and haul away old materials installation waste and associated debris.
Once this is down i can rest ea.
Use a staple gun or hammer tacker to staple the felt to the roof.
This is the most nerve wrenching part of the rebuild for me.
If you re tearing off old roofing the roofer can look for damage that needs to be repaired once the deck is bare.
Ensure that each higher strip slightly overlaps the strip below it.
Lay a strip of felt at the bottom of the roof and move towards the top of the roof with each new strip.
The honey badger demo fork makes quick work out of shingle and sheeting removal.
Roofing material is estimated by the square which is equal to 100 square feet.
And slower rpm than the skill worm drives.
The roof decking is the layer of plywood or o s b.
Get unlimited measurements high definition imagery and free support.
The average roof is 3 000 square feet or around 30 squares.
Roof decking is typically 7 16 and comes in 4 x8 sheets.
This saw i only use for doing roof tear off with shingles still attached i cut starting at the ridge and downhill towards the eave every 32 inches or every other rafter bay.
Sweep area clean of all nails staples.
Roof replacements shall comply with section c402 1 3 c402 1 4 c402 1 5 or c407 where the existing roof assembly is part of the building thermal envelope and contains insulation entirely above the roof deck.