Less than the beam width so you can set the beam easily and shim it up tight to the plate on the ceiling photo 10.
Supporting roof while installing beam.
You can now remove the temporary support wall.
Set the beam photo 9.
Tie in the support beam.
Today we make a window opening bigger.
Tie in the support beam to the jack and king studs and to the ceiling joists.
If our example roof has only one beam it must carry half of the total load or 4 000 pounds.
If there is also a beam in the middle of the roof divide the total load by three.
If you want an open cathedral ceiling you ll need to bring the beam all the way up to the ridge.
Large 8 x 8 posts are necessary for the use of supporting a porch roof.
The loads on the ridge beam are carried by vertical posts at the beam ends down through the building structural walls to the building foundation.
A ridge beam essentially allows us to hang a roof over the beam such that rafter ties can be omitted giving a cathedral ceiling with a completely open space below.
At the ends use metal hurricane straps to connect the beam to the jack studs.
Measure the distance between the bottom of the porch roof and the top of the ledger beams of the porch.
Along the top toe nail the beam to each ceiling joists.
In any case before you can remove the existing load bearing wall you ll need to build some sort of temporary support wall.
Set the beam in place.
Make the supporting member about 1 4 in.
Stay tuned for that.
And nearly all methods will require the addition of a load bearing beam.
While many like to use the smaller 4 x 4 posts they can tend to warp after they have been standing under the weight for several seasons.
Music by casey calhoun www casey.
Cut beams to fit.
If one side of the roof is supported by the house and the other side is supported by the beam divide the total load by two as the beam is only supporting half of the roof.